• Skip to main content
  • Skip to footer

01692 404603 | info@carlbirdltd.co.uk

Carl Bird Ltd

Suppliers Of Skips, Roll on Roll Off Skips, 8 Wheel Tippers & Aggregates

  • Home
  • Services
    • Skip Hire
      • Get A Skip Quote
    • Aggregates
    • RO/RO Hire
    • Tippers
    • Waste Transfer Station
  • Environmental
  • About
    • History
    • Meet the team
    • FAQ
    • Download Certificates
  • Blog
    • Case Studies
  • Contact

Case Studies

Aug 01 2023

Site Clearance in North Walsham

Take a little look at the before and after pictures of a project completed by our team way back in 2020!!!

Customer:
Pike Partnership

Requirements:
Clear the site of overgrown vegetation and any residual wastes.

Process:
Site cleared with our excavator with a 360 waste handling grab attachment and hand tools.
(Yes, our staff are not shy of some manual labour ๐Ÿ˜‰ )
Waste cleared with 8 cubic yard skips and brought to our fully licenced waste transfer station โ€“ Boundary Pit for recovery or disposal.
Land remediation once the waste was removed.

Finish:
The customer was pleased with the end result and we look forward to working with Pike Partnership again.

Written by Samantha · Categorized: Case Studies

Jul 28 2023

Worstead Festival 2023

We are proud to be associated with the Worstead Festival for 2023.

For several years running, we’ve been entrusted by them to provide a waste management solution for the festival weekend. They have a range of stalls, food vendors and demonstrations that all will have waste to dispose of.

Our hookloader driver Kevin, delivered a 40 yard RO/RO bin on Friday to ensure that all the waste right from setup on to end of the weekend on Sunday afternoon was kept together and safely away from the general public.

Once the festival was completed and the last of the tidying was done, the RO/RO was collected and brought back to our waste transfer station here at Boundary Pit, NR28 9NA where it was tipped and sorted by our waste transfer station operatives.

We look forward to hopefully working with all involved with the Worstead Festival in 2024 ๐Ÿ™‚

Written by Samantha · Categorized: Case Studies

Jul 21 2023

Site Clearance

Take a little look at the before and after pictures of a project recently completed by our team.

Customer:
KLBC

Requirements:
Clear the 25 acre site of many years worth of waste materials and vegetation.
Remove to licenced facility and remediate.

Process:
Site cleared with our excavator with a 360 waste handling grab attachment.
Waste cleared on our 8 wheel tipper lorries to our fully licenced waste transfer station – Boundary Pit for recovery or disposal.
Land remediation once the waste was removed.

Finish:
The customer was extremely pleased that we were able to carry out the entire job from start to finish for them in a timely manner. All involved were overjoyed with the end result!!

A very good job done by all our team here at Carl Bird Ltd.

Written by Wayne · Categorized: Case Studies

Footer

Carl Bird Logo

Carl Bird Ltd
Boundary Pit, Sandy Hills, Worstead
Norfolk NR28 9NA

Email: info@carlbirdltd.co.uk
Phone: 01692 404603

Office Hours:
Monday to Friday: 7:30 – 17:00
Saturday: Office closed
Site Hours:
Monday to Friday: 7:00 – 17:00
Saturday: 7:00 – 12:00

  • Home
  • GDPR
  • T&C
  • Privacy Policy
  • Cookie Policy
  • Contact

Copyright © 2024 Carl Bird Ltd ยท Website by Wayne Beauchamp.